
The Old Gotthard Tunnel Route - Driver's Eye View (2018)
NR
|
Oct 01, 2018 (GB)
|
Documentary
|
01:52
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Featured Crew
Writer, Producer
Cast

Jonathan Kydd
Narrator
London Underground Driver's Eye View

SkyeTrain
1987

1066 DC
1988

HST Far West
1990

Ffestiniog & Conwy
1992

Central
1992

HST Great West
1993

Learning to Steam
1993

InterCity Norwich
1997

The Cumbrian Coast
1997

Connex Express
1998

The Flying Scotsman
2000

Midland Mainline
2000

Transpenninexpress
2000

Highland Main Line
2002

The Down Fishguard
2002

The Uckfield Thumper
2003

Lickey Voyager
2005

Marseille to Paris
2005

Kent Coast
2007

Central Line
2011

The Royal Scot
2012

Welsh Marches
2012

Reading to Waterloo
2013

Hammersmith & Circle
2014

North Wales Coast
2016

Fawley Hill
2023